Stomra Guides

Stomra · Guide

Versions and alternatives

Stomra keeps every version of a project. An alternative lets you try a design beside the main project, then add its work, make it the main or put it aside.

Main the project Timber roof Alternative 2 started from a version of Main THEN ONE OF THREE WAYS Add this work to the project Main takes the changes you tick. Main keeps its own work too. Make this the main project alternative It becomes the project clients see. The old Main is kept as Previous main. Put this alternative aside Kept whole, out of the way. Open it again, or bring it back. a named version a version saved as you work work added
An alternative starts from any version of Main and runs beside it. When its work is done, it ends one of three ways. Nothing is thrown away in any of them.

Versions, saved as you work

You do not have to remember to save. A little while after you stop editing, Stomra keeps a version of the model by itself. Each version knows who made it, when, and what it changed, said in plain words, such as “3 walls added on Plan 2”.

Click Saved in the top bar to see the newest versions. Open one to read what it changed, to see What changed since it, or to go back to it. At the bottom of the list, History, alternatives and compare… opens the project's whole history.

History draws every version on a timeline, one row for Main and one for each alternative. History as a timeline explains how to read it, its marks and its filters.

Named versions

Before a large change, or at a moment you will want to find again, save a named version: Save version… in the Saved list or in History. Give it a name and a note, such as “Before facade change”. A named version stands out in the list and as a star on the timeline, and it is the natural point to compare with later.

Ask your assistant to save a named version before it changes many things at once, such as every exterior wall type. Afterwards it can compare with that version and tell you exactly what changed.

Going back

To return the model to an earlier state, choose the version and press Go back to this version (in the Saved list) or Restore as a new version (in History). Stomra does not erase what came after: it adds the old state on top as a new version. Nothing is lost, and Undo takes it back.

An element has a history of its own too. Select it, and the Inspector lists the versions that changed it, who made them and what else changed with them.

In walk mode, History runs down the left side of the view. The minus and plus keys step to an older or a newer version while you stand where you are, so you see the building change around you. Stepping only looks; going back is done in History.

Compare

Choose a version in History and press Compare with now to see what has changed between it and the model as it is, or What changed in it for that one version's own changes.

Alternatives

An alternative is a line of work inside the project: a place to try a roof, a layout or a structural scheme while the main project stays as it is. It is not a copy of the project. Its files, markups and sharing are the project's, and a colleague who opens the same alternative works in the same one.

Each project has one Main: the project everyone works in and clients see. Main is Alternative 1. The others are numbered 2, 3 and so on, each with a title and a line about what it is.

Start one

  1. Open Alt. Designs in the top bar and choose New alternative…, or choose a version in History and press New alternative from here to start from that moment rather than from now.
  2. Give it a title and a line about what it is, for example “Timber roof” and “Glulam rafters in place of trusses”. Clients read this line if you publish the alternative.
  3. The tab switches to the new alternative. Work as usual.

To change the title or the line later, for Main or an alternative, press Name it for clients… on its card in History.

Working in an alternative

You always see when you are in an alternative. An amber bar under the top bar names it and says that the main project is unchanged until you add this work to it; a thin amber frame runs round the workspace; the Saved chip and the browser tab's title start with its name. Open main in the bar takes the tab back to Main.

Alt. Designs lists the project's alternatives by number and title, with the one you are on ticked. Choose another and the tab switches to it, keeping what you did as a version first. The ways an alternative can end are in the same menu while you work in one.

In History, choosing an alternative opens its card: what clients read for it, when and from which version it started, who worked on it, what it changed, and how many versions Main has made since. The card holds the three ways described next.

Add this work to the project

Use this when the alternative was work for the project, not a different design. Someone spent a few days on the piping in an alternative, while a colleague went on with the structure in Main: the piping should join Main, and Main should keep the structure.

  1. On the alternative's card, or in Alt. Designs while you are in it, choose Add this work to the project…. Stomra opens Main with the review of what this work changes.
  2. The changes are listed by discipline, level and kind of element, every one ticked. Untick what should stay as Main has it. An unticked change stays in the alternative, and next time only what is left is offered.
  3. A change goes with what it cannot stand without. Unticking a new wall unticks the door in it; ticking the door ticks its wall.
  4. Where Main changed the same thing too, the change is marked. Choose Keep main's or Take the alternative's.
  5. Press Add to the project. Main gets a version that says whose work was added, and the timeline draws it as a ring on Main.

Make an alternative the main project

Use this when the alternative is the better design and should become the project. Make this the main project alternative… says what happens in two sentences: the alternative becomes the project everyone works in and clients see, and the current Main is kept as Previous main · until the date, to open or make the main again at any time. Press Make it the main.

If people changed Main while you worked on the alternative, Stomra says who and how much before anything happens, and offers to bring their work into the alternative first. You can also make it the main without that work; it then stays in Previous main.

Main is a label. Making an alternative the main moves the label; it does not combine two models. Nothing is thrown away: the old Main is a whole line of work you can open, work in and make the main again with the same button.

Drawings follow. The next issue of the new Main gives each sheet the letter after the latest that either line issued: if Main issued A-101 at A and the alternative went on to B, the next is C, so no letter is given twice.

Put an alternative aside

When you have tried three schemes and go on with one, the other two need not stay in the way. Put this alternative aside… keeps it whole and moves it out of the list. Alt. Designs shows it under Set aside, where it can still be opened to look at or work in, and Bring it back returns it among the others. History lists set-aside alternatives in a group of their own.

Alternatives for clients

When you publish drawings from more than one alternative, the client portal shows them as alternatives the client can study and choose between.

A card for each

The alternatives stand first on the page, each with its number, title and newest revision. The one you recommend is marked, and the page opens on it.

Compare alternatives

Side by side: mass in total and by material, how many of each kind of element, which drawings differ, and a walk through each. Quantities only, never costs.

The client's choice

A signed-in client can press Choose this one. It is a request: you confirm it, or answer, from Review ▸ Portal. The others are then marked Not chosen.

Prints that say which

An alternative's drawings print its name in the title block and in the file name, since alternatives share drawing numbers. Main prints nothing extra.

Your assistant and alternatives

Your AI assistant works with versions the way you do. It can save a named version before a large change, compare with it afterwards, and go back. When you ask it to try something, it asks whether to start an alternative first. It never moves your tab to another alternative without your word, and it says in every answer when your tab is on an alternative. It can publish several alternatives in one go, as Publish alternatives… does, on your word only. See Modelling with your AI assistant.

A prompt that works: “Save a version called ‘Before roof study’, start an alternative called ‘Timber roof’, and model the roof with glulam rafters there. Leave Main as it is.”

The words

WordWhat it means in Stomra
VersionThe model at one moment, kept with who made it and what changed. Saved by itself as you work, or named by you.
Named versionA version saved with a name and a note, to find and compare with later.
MainThe project everyone works in and clients see. Alternative 1.
AlternativeA line of work beside Main, started from one of its versions, numbered 2, 3 and on.
Add this work to the projectMain takes the alternative's changes you tick, and keeps its own.
Make the mainThe alternative becomes the project; the old Main is kept as Previous main.
Set asideAn alternative kept whole but out of the list, to open or bring back at any time.
IssueDrawings sent out from Main or from an alternative, with their revision letters.